近期论文
查看导师新发文章
(温馨提示:请注意重名现象,建议点开原文通过作者单位确认)
2015-2017年
(1)Weiwei Cu,Zhiqiang Lu、E.S. Pan, Integrated production scheduling and maintenance policy for robustness in a single machine, Computers & Operations Research,47,pp 81–91,2014,SCI
2012-2014年
(1)Da Wen, E.S.Pan, Wang Y., Liao W.Z.,An economic production quantity model for a deteriorating system integrated with predictive maintenance strategyIdentifier, Journal of Intelligent manfacturing, online,(DOI) 10.1007/s10845-014-0954-z(通讯作者).
(2)E.S.Pan, G.N.Wang, L.F.Xi, L. Chen, X.L.Han, Single-machine group scheduling problem considering learning & forgetting effects and preventive maintenance, International Journal of Production Research, online.
(3)Wei-Wei Cui, Zhiqiang Lu, Ershun Pan, Integrated production scheduling and maintenance policy for robustness in a single machine, Computers & Operation, 2014, 47: 81-91.
(4)E.S.Pan, Jin Yao, An integrated EPQ model based on a control chart for an imperfect production process, International Journal of Production Research, 2012, 50(23):6999-7012.
(5)E.S.Pan, W.Z. Liao, L.F. Xi, A joint model of production scheduling and predictive maintenance for minimizing job tardiness, International Journal of Advanced Manufacturing Technology, 2012, 60(9-12):1049-1061.
(6)E.S.Pan, Liao W. Z., Xi L. F., Single-machine based scheduling optimization model integrated preventive maintenance policy for maximizing the availability, International Journal of Industrial and Systems Engineering, 2012, 10(4): 451-460..
2009年-2011年
(1)E.S.Pan, Y. Wang, Jin Y., Integrated design of feedforward and feedback control for process variation based on statistical model, Advanced Science Letters, 2011, 4(4-5): 1466-1472.
(2)E.S.Pan , Jin Y., Wang Y., Integration of the optimal economic production quantity policy in the optimization design of control charts based on Taguchi’s loss function and random process shift, International Journal of Manufacturing Technology Management, 2011, 22(7), 929-946.
(3)E.S.Pan , Liao W. Z., Xi L. F., Single-machine-based production scheduling model integrated preventive maintenance planning, The International Journal of Advanced Manufacturing Technology, 2010, 50(1-4): 365–375.
(4)E.S.Pan, Liao W. Z., Zhuo M. L., Periodic Preventive Maintenance Policy with Infinite Time and Limit of Reliability Based on Health Index. Journal of Shanghai Jiaotong University(Science), 2010, 15(2): 231-235.
(5)L.Ye, E.S.Pan , Jianjun Shi, Design of regression model based automatic process control with reduced adjustment frequency, Quality and Reliability Engineering International, 2009, 25(8): 997-1013.
(6)Liao W., E.S.Pan, Xi L. F., Preventive Maintenance Scheduling for Repairable System with Deterioration. Journal of Intelligent Manufacturing, 2010, 21(6): 875-884.
(7)E.S.Pan,Ye L., J. Shi, T. S. Chang. On-line bleeds detection in the continuous casting processes using Engineering-driven Rule-based algorithm, ASME Transactions, Journal of Manufacturing Science and Engineering, 2009, 131(6)
(8)Liao W. Z.,E.S.Pan, Xi L. F., A condition-based maintenance policy for intelligent monitored system. International Journal of Computer Applications in Technology, 2009, 35(2/3/4): 104-112.
(9)S. C. Du; L. F. Xi; E.S.Pan, Liu, C.R., Design of measurement system for quality improvement in multi-stage manufacturing systems, International Journal of Radio Frequency Identification Technology and Applications, 2009, 2(3-4): 165-82.
(10)J.W. Sun, L.F.Xi, E.S.Pan, S. C. Du, B. Ju, Integration of product quality and tool degradation for reliability modelling and analysis of multi-station manufacturing systems. International Journal of Computer Integrated Manufacturing, 2009, 22(3): 267-279.
2006年-2008年
(1)L.Ye, E.S.Pan, L. F. Xi., An adaptive SPC monitoring scheme for DOE-based APC, Journal of Systems Engineering and Electronics, 2008, 19(2): pp.329-336.
(2)S.D., L.F.Xi, Jun Ni, E.S.Pan, Liu C.R., Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology, Computers in Industry, 2008, 59(2-3), pp.180-92.
(3)Du S.C.,Xi L.F.,Ni Jun,E.S.Pan,Liu C. Richard.Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology.Computers in Industry,2008,59(2-3),pp. 180-192.(SCI/EI080311021458)
(4)Du,S., Lv,J.,Xi,L.F., E.S.Pan, Analysis of product quality with consideration of influence of manufacturing errors in discrete-part machining systems, Int. J. Computer Applications in Technology,2008, Vol.33, No.1, pp.3-11
(5)S.C.Du, L.F.Xi,E.S.Pan, Shi Jianjun, Ni Jun, Liu C. Richard, Diagnosability Study for Quality Improvement based on Distributed Sensing and Information Technology, International Journal of Computer Applications in Technology, 2007, 28(2/3), pp.117–127. (EI072510656936)
(6)S.C.Du, L.F.Xi, E.S.Pan, and C. Richard Liu,, Modeling and Control of Dimensional Quality of A Serial Multi-station Machining System, International Journal of Reliability Quality and Safety Engineering, 2006, 13(5), pp.399-420. (EI064710255253)
2006年以前
(1)Z.Wu, M Shamsuzzaman, E.S.Pan, Optimization design of the control charts based on Taguchi's loss function and random process shifts, International Journal of Production Research,2004, 42(2), pp.379-390. (SCI750ZJ EI04118055585)
部分国际会议论文
(1)Liao, W . Z., Pan, E. S., Xi, L. F., Data-driven performance assessment and prediction approach for machinery prognostics, International Conference on Computer-Aided Material and Engineering (ICCME), Informational-An International Interdisciplinary Journal, 2011, 14(12): 3889-3896
(2)Cang, T., Pan, E. S., Zhang, M. X.,Optimization study of reflow soldering profile for surface mount technology,Proceedings of 2011 International Conference on Computer Science and Network Technology, ICCSNT 2011, v 3, p 1772-1775, 2011.
(3)Liao, W.Z., Pan,E.S.; Xi,L.F.,Dynamic preventive maintenance policy based on health index,2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2007, p 930-934.
(4)L.Ye, E.S.Pan, L.F.Xi. Impacts of regression model uncertainties on automatic process control performance and cautious solution, The 6th Korea-China Quality Symposium, Korea,2007.
(5)L.Ye, E.S.Pan, L.F.Xi. DOE-based hybrid automatic process control for variation reduction, The 2nd International Conference on Innovative Computing, Information and Control, 2007.10, Japan.
(6)Pan E.S.,Ye L., Xi L.F., Adaptive Control Charts with Variable Parameters for DOE-based APC, International MultiConference of Engineers and Computer Scientists, Vols I and II Book Series: Lecture Notes in Engineering and Computer Science Pages: 2061-2066 HongKong, Published: 2007(SCIBGG99/)
(7)L.Ye, E.S.Pan, L.F.Xi. A methodology and modeling for robust parameter control using observable noise factors, The Fourth International Conference on Quality and Reliability, Beijing, 2005, pp. 275-282. (Excellent Paper Award)
部分中文期刊论文
2015-
(1)崔维伟、*陆志强、潘尔顺 ,基于多目标优化的生产调度与设备维护集成研究 ,计算机集成制造系统 ,20,pp 1398-1404,2014.
2014年以前
(1)王桂娜,潘尔顺,可重构制造系统预防维护策略与EPQ整合模型. 上海交通大学学报, 2012,46(05): 712-716.
(2)王桂娜,俞秉昊,潘尔顺等,成组生产条件下考虑学习和遗忘效应及设备维护的调度策略,上海交通大学学报,2013, 47(05): 723-727.
(3)廖雯竹,潘尔顺,王莹,奚立峰,SPR和ARMA在设备剩余寿命预测中的应用研究,上海交通大学学报,2011, 45(7): 1000-1005.
(4)沙建军,潘尔顺,基于改进自适应神经模糊推理模型的回流焊参数设定方法,上海交通大学学报,2011,45(2):1741-1746.
(5)金垚,仓婷,潘尔顺,王莹,基于田口质量损失函数和控制图设计的经济生产批量模型,计算机集成制造系统,2011,17 (10):2224-2230.
(6)潘尔顺,陆志强,周剑,考虑故障率交互作用的双组件系统周期性预防维护策略,系统工程理论与实践,2011, 31(3):537-543。
(7)潘尔顺,金尧,叶亮. 基于逻辑回归的计数型质量特性健壮参数谨慎控制策略研究,上海交通大学学报,2010, 44(12):1711-1715.
(8)夏唐斌, 奚立峰, 周晓军, 潘尔顺, 串并联衰退系统的多目标预防性维护优化建模, 计算机集成制造系统, 2010, 16(4), pp.783-787.
(9)潘尔顺,吴洪飞, 整合成本及利用率动态维护策略研究, 潘尔顺,吴洪飞, 上海交通大学学报, 2009, Vol.43 No.8, pp.134-137.
(10)廖雯竹,潘尔顺,奚立峰, 基于设备可靠性的动态预防维护策略,上海交通大学学报, 2009, Vol.43 No.8, pp.1332-1336.
(11)叶亮, 潘尔顺, 奚立峰. 鲁棒参数控制方法的谨慎控制律研究, 哈尔滨工业大学学报, 2008, 40(11), pp. 1800-1804.
(12)田海晶,潘尔顺,自相关过程的多变量统计过程监控, 上海交通大学学报,Vol.42, No.3,2008.pp.496-499.
(13)潘尔顺,徐小芸,奚立峰,基于有限元法与田口方法的V行件冲压加工模具稳健性设计,材料科学与工艺,2008, Vol.16, No.5, pp.679-683.
(14)廖雯竹,潘尔顺,奚立峰,基于健康指标的设备动态预防维护策略研究, , 计算机集成制造系统CIMS, 2008, Vol.14, No.4, pp.829-832.
(15)廖雯竹,潘尔顺,奚立峰, 基于Tabu搜索和蚂蚁算法的系统可靠性分配及研究, 上海交通大学学报,2008, Vol. 42, No.8, pp.1291-1296。
(16)孙继文,奚立峰,潘尔顺,杜世昌.面向产品尺寸质量的制造系统可靠性建模与分析.上海交通大学学报,2008,42(7),pp.1100-1104.
(17)孙继文,奚立峰,潘尔顺,杜世昌.基于敏感度分析的制造系统工位设计布置评价.机械工程学报,2008,44(10),pp.38-43.
(18)周炳海,何平,潘尔顺,奚立峰.基于失效率减缓的质保产品预防性维护建模.上海交通大学学报,2008,42(7),pp.1178-1182.
(19)周炳海,何平,潘尔顺,奚立峰.基于Markov链的集束型晶圆制造设备预防性维护建模.上海交通大学学报,2008,42(10),pp.1622-1626.
(20)叶亮,潘尔顺,奚立峰, 基于鲁棒参数控制方法的可变控制线控制图, 计算机集成制造系统, 2007, Vol.13, No.4., pp. 817-821.
(21)叶亮,潘尔顺,奚立峰, 模型精度对自控性能的影响及谨慎控制策略, 计算机集成制造系统, 2007, Vol.13, No.10., pp.1952-1957.
(22)吴洪飞,潘尔顺, 基于实验设计和神经网络的冲压信号特征提取与诊断, 机械科学与技术, 2007, Vol.26, No.11, pp.1385-1389.
(23)叶亮,潘尔顺,奚立峰, 基于实验设计的健壮参数控制方法, 上海交通大学学报, 2006, Vol.40, No.6, pp.918-921.
(24)杜世昌,奚立峰,潘尔顺, 多阶段制造系统中尺寸偏差建模与控制, 上海交通大学学报,2006, Vol.40, No. 4, pp. 583-587.
(25)杜世昌,奚立峰,潘尔顺, 面向质量控制的制造系统可诊断性分析, 机械工程学报, 2006, Vol.42, No.5, pp.149-154.
(26)杜世昌,奚立峰,潘尔顺,串并联混合式多阶段制造系统产品质量建模与控制, 计算机集成制造系统, 2006, Vol.12, No.7, pp.1068-1073.
(27)潘尔顺,徐小芸,, 基于有限元法与田口法的V形冲压仿真参数稳健设计, 上海交通大学学报, 2005, Vol.39, No.7, pp.1077-1081.
(28)潘尔顺,李庆国, 田口损失函数的改进及在最佳经济生产批量中应用, 上海交通大学学报, 2005, Vol.39, No.7, pp.1119-1123.