近期论文
查看导师新发文章
(温馨提示:请注意重名现象,建议点开原文通过作者单位确认)
[1] Li K., Xu S-L., Fu H. Work-break scheduling with real-time fatigue effect and recovery. International Journal of Production Research. 2020; 58(3): 689-702.
[2] Li K., Zhou T., Liu B-H. Internet-based intelligent and sustainable manufacturing: developments and challenges. The International Journal of Advanced Manufacturing Technology. 2020; 108: 1767-1791.
[3] Li K., Chen J-F., Fu H., Jia Z-H., Wu J. Parallel machine scheduling with position-based deterioration and learning effects in an uncertain manufacturing system. Computers & Industrial Engineering. 2020; 149:106858.
[4] Li K., Liu J., Fu H., Liu B-H. Acquisition and pricing strategies in hybrid manufacturing-remanufacturing systems. Journal of Manufacturing Systems. 2020; 57: 217-230.
[5] Li K., Pan Y., Liu B-H., Cheng B-Y. The setting and optimization of quick queue with customer loss. Journal of Industrial and Management Optimization. 2020, 16(3): 1539-1553.
[6] Fu H., Li K., Fu W-Z. Investing in suppliers with capacity constraints in a decentralized assembly system. Computers & Industrial Engineering. 2020; 142: 106332.
[7] Zhang H., Jia Z-H., Li K. Ant colony optimization algorithm for total weighted completion time minimization on non-identical batch machines. Computers and Operations Research. 2020; 117: 104889.
[8] Jia Z-H., Li Y-J., Li K., Chen H-P. Weak-restriction bi-objective optimization algorithm for scheduling with rejection on non-identical batch processing machines. Applied Soft Computing. 2020; 86: 105914.
[9] Jia Z-H., Huo S-Y., Li K., Chen H-P. Integrated scheduling on parallel batch processing machines with non-identical capacities. Engineering Optimization. 2020; 52(4): 715-730.
[10] Qian S-Y., Jia Z-H., Li K. A multi-objective evolutionary algorithm based on adaptive clustering for energy-aware batch scheduling problem. Future Generation Computer Systems. 2020; 113: 441-453.
[11] Li K., Xiao W., Yang S-L. Scheduling uniform manufacturing resources via the Internet: a review. Journal of Manufacturing Systems. 2019; 50: 247-262.
[12] Li K., Xiao W., Yang S-L. Minimizing total tardiness on two uniform parallel machines considering a cost constraint. Expert Systems with Applications. 2019; 123: 143-153.
[13] Li K., Chen J., Fu H., Jia Z., Fu W. Uniform parallel machine scheduling with fuzzy processing times under resource consumption constraint. Applied Soft Computing. 2019; 82: 105583.
[14] 李凯, 徐淑玲, 程八一, 杨善林. 考虑成本限制的最小化最大延迟时间平行机调度问题.系统工程理论与实践. 2019; 39(1): 165-173.
[15] 李凯, 杨阳, 刘渤海. 考虑成本的最大延迟时间同类机调度问题. 运筹与管理. 2019; 28(12): 178-184.
[16] Cheng B-Y., Zhu H-J., Li K., Li Y-J. Optimization of batch operations with a truncated batch-position-based learning effect. Omega. 2019; 85: 134-143.
[17] Cheng B-Y., Leung J. Y-T., Li K., Yang S-L. Integrated optimization of material supplying, manufacturing and product distribution: models and fast algorithms. European Journal of Operational Research. 2019; 277: 100-111.
[18] Jia Z-H., Zhuo X-X., Leung J. Y-T. and Li K. Integrated production and transportation on parallel batch machines to minimize total weighted delivery time. Computers & Operations Research. 2019; 102: 39-51.
[19] Jia Z-H., Yan J., Leung J. Y T., Li K., Chen H. Ant colony optimization algorithm for scheduling jobs with fuzzy processing time on parallel batch machines with different capacities. Applied Soft Computing. 2019; 75: 548-561.
[20] Liu W., Ma W., Hu Y., Ji M., Li K., Chang X., Yu X. Production planning for stochastic manufacturing/remanufacturing system with demand substitution using a hybrid ant colony system algorithm. Journal of Cleaner Production. 2019; 21: 999-1010.
[21] Li K., Zhou T., Liu B-H. The comparison between selling and leasing for new and remanufactured products with quality level in the electric vehicle industry. Journal of Industrial and Management Optimization. Accepted for publication.
[22] Li K., Pan Y., Cheng B-Y., Liu B-H. The setting and optimization of quick queue. Journal of Optimization Theory and Applications. 2018; 178(3): 1014-1028.
[23] Li K., Zhang H-J., Cheng B-Y., Pardalos P.M. Uniform parallel machine scheduling problems with fixed machine cost. Optimization Letters; 2018; 12(1): 73-86.
[24] Li K., Zhou T., Liu B-H Li H. A multi-agent system for sharing distributed manufacturing resources. Expert Systems with Application. 2018; 99(1): 32-43.
[25] Jia Z-H., Zhang H., Long W-T., Leung J. Y-T., Li K. and Li W. A meta-heuristic for minimizing total weighted flow time on parallel batch machines. Computers & Industrial Engineering. 2018; 125: 298-308.
[26] Cheng B-Y., Pei J., Li K., Pardalos P.M. Integrated scheduling of production and distribution for manufacturers with parallel batching facilities. Optimization Letters. 2018; 12: 1609-1623.
[27] Li K., Zhang X., Leung J. Y-T., Cheng B-Y. Integrated production and delivery with multiple factories and multiple customers. International Journal of Systems Science: Operations & Logistics. 2017; 4(3): 219-228.
[28] Jia Z-H., Leung J. Y-T., Wen T-T., Li K. Effective heuristics for makespan minimization in parallel batch machines with non-identical capacities and job release times. Journal of Industrial and Management Optimization. 2017; 13(2): 977-993.
[29] Cheng B-Y., Leung J. Y-T., Li K. Integrated scheduling on a batch machine to minimize production, inventory and distribution costs. European Journal of Operational Research. 2017; 258(1): 104-112.
[30] Jia Z-H., Zhang Y-L., Leung J. Y-T.,Li K. Bi-criteria ant colony optimization algorithm for minimizing makespan and energy consumption on parallel batch machines. Applied Soft Computing. 2017; 55: 226-237.
[31] Pei J., Liu X., Pardalos P.M., Li K., Fan W., Migdalas A. Single-machine serial-batching scheduling with a machine availability constraint, position-dependent processing time, and time-dependent set-up time. Optimization Letters. 2017; 11(7): 1257-1271.
[32] Li K., Zhou C., Leung J. Y-T., Ma Y. Integrated production and delivery with single machine and multiple vehicles. Expert Systems with Applications, 2016; 57: 12-20.
[33] Li K., Zhang X., Leung J. Y-T., Yang S-L. Parallel machine scheduling problems in green manufacturing industry. Journal of Manufacturing Systems, 2016; 38: 98-106.
[34] Liu C., Wang J., Leung J.Y-T., Li K. Solving cell formation and task scheduling in cellular manufacturing system by discrete bacteria foraging algorithm. International Journal of Production Research. 2016; 54(3): 923-944.
[35] Li K., Jia Z-H., Leung J. Y-T. Integrated production and delivery on parallel batching machines. European Journal of Operational Research. 2015; 247: 755-763.
[36] Li K., Yang S-L., Leung J. Y-T., Cheng B-Y. Effective meta-heuristic for scheduling on uniform machines with resource dependent release dates. International Journal of Production Research, 2015; 53(19): 5857-5872.
[37] Li K., Li H., Cheng B-Y., Luo Q. Uniform parallel machine scheduling problem with controllable delivery times. Journal of Systems Science and Information, 2015; 3(6): 525-537.
[38] Jia Z-H., Li K., Leung J. Y-T. Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities. International Journal of Production Economics, 2015; 169: 1-10.
[39] Cheng B-Y., Leung J. Y-T., Li K., Yang S-L. Single batch machine scheduling with deliveries. Naval Research Logistics, 2015; 62: 470-482.
[40] Cheng B-Y., Leung J. Y-T., Li K. Integrated scheduling of production and distribution to minimize total cost using an improved ant colony optimization method. Computers & Industrial Engineering, 2015, 83: 217-225.
[41] Cheng B-Y., Li K., Hu X-X. Approximation algorithms for two-stage supply chain scheduling of production and distribution. International Journal of Systems Science: Operations & Logistics, 2015; 2(2): 78-89.
[42] Li K., Leung J. Y-T., Cheng B-Y. An agent-based intelligent algorithm for uniform machine scheduling to minimize total completion time, Applied Soft Computing, 2014; 25: 277-284.
[43] Cheng B-Y., Yang S-L., Hu X-X., Li K. Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes, International Journal of Systems Science, 2014; 45(3): 571-578.
[44] 李凯, 王明星, 杨平, 马英. 单机多车情形生产与配送协同调度算法. 计算机集成制造系统, 2014; 20(12):3011-3019.
[45] 程八一, 李明, 陈波, 李凯. 差异分批模式下的供应链调度算法. 系统工程学报, 2014; 29(4):515-526.
[46] 孙超平, 杨平, 李凯. 考虑外包的平行机调度问题的多目标遗传算法. 中国机械工程, 2014; 25(23):3174-3179.
[47] 李凯, 罗庆, 杨善林. 释放时间具有凸减函数约束的单机调度问题. 系统工程理论与实践, 2013; 33(6):1516-1522.
[48] 李凯, 史烨, 马英. 具有凸资源消耗函数的最小化Makespan的平行机调度问题. 管理工程学报, 2013; 27(1):56-62.
[49] 杨善林, 周永务, 李凯 等. 制造工程管理中的优化理论与方法, 北京: 科学出版社, 2012年6月(专著).
[50] 史烨, 李凯, 左春荣. 加工时间依赖于资源消耗量的平行机调度问题. 系统工程理论与实践, 2012; 32(7): 1485-1493.
[51] Li K., Yang S-L., Ren M-L. Single machine scheduling problem with resource dependent release dates to minimize total resource-consumption, International Journal of Systems Science, 2011; 42(10): 1811-1820.
[52] Li K., Yang S-L., Ma H-W. A simulated annealing approach to minimize the maximum lateness on uniform parallel machines, Mathematical and Computer Modelling, 2011; 53: 854-860.
[53] Li K., Shi Y., Yang S-L., Cheng B-Y. Parallel machine scheduling problem to minimize makespan with resource dependent processing times, Applied Soft Computing, 2011; 11(8): 5551-5557.
[54] Li K., Yang S-L. Heuristic algorithms for scheduling on uniform parallel machines with heads and tails, Journal of Systems Engineering and Electronics, 2011; 22(3): 462-467.
[55] 柳春锋, 李凯, 杨善林. 基于改进DP 算法的具有优先序的变速机最小化成本调度. 系统工程理论与实践, 2011; 31 (2):276-282.
[56] Cheng B-Y., Li K., Chen B. Scheduling a single batch-processing machine with non-identical job sizes in fuzzy environment using an improved ant colony optimization, Journal of Manufacturing Systems, 2010; 29: 29-34.
[57] 李凯, 靳鹏, 张述初. 作业到达时间不同的同类机调度问题的可变邻域搜索算法. 系统工程学报, 2010; 25(2):258-263.
[58] Li K., Yang S-L. Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms, Applied Mathematical Modelling, 2009; 33(4): 2145-2158.
[59] 李凯, 任明仑, 张述初. 考虑尾时间的同类机调度问题的可变邻域搜索算法. 系统管理学报, 2009; 18(2):206-210.
[60] Li Kai, Yang S-L. Concise review of relaxations and approximation algorithms for non-identical parallel-machine scheduling to minimize total weighted completion times. Journal of Systems Engineering and Electronics, 2008; 19(4): 827-834.
[61] 李凯,靳鹏. 含作业到达时间的同类机调度问题启发式算法. 系统工程理论与实践, 2007; 27(10): 105-111.