一作论文:
1. Liu, S.Q., Kozan, E., Masoud, M., Zhang, Y., Chan, F.T.S. (2018). Job shop scheduling with a combination of four buffering constraints. International Journal of Production Research. 56(9), 3274-3293. doi: 10.1080/00207543.2017.1401240. (SCI-1 journal, IF: 2.623; 11 citations)
2. Liu, S.Q., & Kozan, E. (2019). Integration of mathematical models for ore mining industry. International Journal of Systems Science: Operations & Logistics. 6(1), 55-68. (4 citations)
3. Liu, S.Q., & Kozan, E. (2017). A hybrid metaheuristic algorithm to optimise a real-world robotic cell. Computers & Operations Research, 84, 188-194. doi: 10.1016/j.cor.2016.09.011. (SCI-1 journal; five-year IF: 3.433; 17 citations)
4. Liu, S.Q., & Kozan, E. (2016). New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems. Expert Systems with Applications, 43, 59-65. doi:10.1016/j.eswa.2015.08.044. (SCI-1 journal; five-year IF: 4.577; 27 citations)
5. Liu, S.Q., & Kozan, E. (2016). Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements. Computers & Operations Research, 74, 31-41. doi: 10.1016/j.cor.2016.04.023. (SCI-1 journal; five-year IF: 3.433; 20 citations)
6. Liu, S.Q., & Kozan, E. (2012). A hybrid shifting bottleneck procedure algorithm for the parallel-machine job-shop scheduling problem. Journal of the Operational Research Society, 63, 168–182. doi:10.1057/jors.2011.4. (SCI-2 journal; published for over 65 years; IF: 1.225; 34 citations)
7. Liu, S.Q., & Kozan, E. (2012). An interactive planning and scheduling framework for optimising pits-to-crushers operations. Industrial Engineering and Management Systems, 11(1), 94–102. doi:10.7232/iems.2012.11.1.094. (An OR journal in Korea; IF: 0.27; 12 citations)
8. Liu, S.Q., & Kozan, E. (2011). Optimum utilisation of rolling stocks for iron ore mining industries. Advanced Materials Research, 361-363, 1529–1534. doi:10.4028/www.scientific.net/AMR.361-363.1529. (EI journal; 2 citations)
9. Liu, S.Q., & Kozan, E. (2011). Scheduling trains with priorities: A no-wait blocking parallel-machine job-shop scheduling model. Transportation Science, 45(2), 175–198. doi:10.1287/trsc.1100.0332. (SCI-1 journal; five-year IF: 4.581; 81 citations)
10. Liu, S.Q., & Kozan, E. (2011). Optimising a coal rail network under capacity constraints. Flexible Services and Manufacturing Journal, 23(2), 90–110. doi:10.1007/s10696-010-9069-9. (SCI-2 journal; IF: 2.346; 26 citations)
11. Liu, S.Q., & Kozan, E. (2009). Scheduling a flow shop with combined buffer conditions. International Journal of Production Economics, 117(2), 371–380. doi:10.1016/j.ijpe.2008.11.007. (SCI-1 journal; five-year IF: 5.631; 43 citations)
12. Liu, S.Q., & Kozan, E. (2009). Scheduling trains as a blocking parallel-machine job shop scheduling problem. Computers and Operations Research, 36(10), 2840–2852. doi:10.1016/j.cor.2008.12.012. (SCI-1 journal; IF: 3.433; 125 citations)
13. Liu, S.Q., Ong, H. L., & Ng, K. M. (2005). Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem. Advances in Engineering Software, 36(3), 199–205. doi:10.1016/j.advengsoft.2004.10.002. (SCI-2 journal; IF: 4.251; 64 citations)
14. Liu, S.Q., Ong, H. L., & Ng, K. M. (2005). A fast tabu search algorithm for the group shop scheduling problem. Advances in Engineering Software, 36(8), 533–539. doi:10.1016/j.advengsoft.2005.02.002. (SCI-2 journal; IF: 4.251; 39 citations)
15. Liu, S.Q., & Ong, H. L. (2004). Metaheuristics for the mixed shop scheduling problem. Asia-Pacific Journal of Operational Research, 21(4), 97–115. (SCI-3 journal; IF: 0.820; 32 citations)
16. Liu, S.Q., & Ong, H. L. (2002). A comparative study of algorithms for the flowshop scheduling problem. Asia-Pacific Journal of Operational Research, 19, 205-222. doi:10.1017/CBO9781107415324.004. (SCI-3 journal; IF: 0.820; 33 citations)
17. Liu, S. Q., & Yang, Y. S. (2000). Cycle time and entropy generation of finite-time endoirreversible Carnot engine. Journal of Engineering for Thermal Energy and Power, 15(87), 232-234. (EI journal; 1 citation)
18. Liu, S.Q., & Yang, Y. S. (2000). Triple optimal analytical method used in energy systems considering ecological effect. Journal of Engineering for Thermal Energy and Power, 15(86), 98-99. (EI journal)
实际一作论文:
19. Kozan, E., & Liu, S.Q.# (2012). A demand-responsive decision support system for coal transportation. Decision Support Systems, 54(1), 665–680. doi:10.1016/j.dss.2012.08.012. (SCI-1 journal; IF: 4.903; 36 citations)
20. Kozan, E. & Liu, S.Q.# (2017). An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations. International Journal of Mining, Reclamation and Environment, 31(7), 457-474. (SCI-3 journal; IF: 1.258; 10 citations)
21. Kozan, E., & Liu, S.Q.# (2017). A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations. Mining Technology. 125(1), 47-53. doi:10.1179/1743286315Y.0000000031. (EI journal of Taylor Francis; 17 citations).
22. Kozan, E., & Liu, S.Q.# (2011). Operations research for mining : A classification and literature review. ASOR Bulletin, 30, 2–23. (An OR journal in Australia; 11 citations)
23. Yang, Y. S., & Liu, S.Q.# (2000). Finite-time endoirreversible Carnot engine’s irreversible factor. Journal of Engineering for Thermal Energy and Power, 15(86), 107-109. (EI journal; 7 citations)
通讯作者论文:
24. Li W., Xi Y., Wu F., Masoud M., Liu S.Q.* (2019) Green development performance of water resources and its economic-related determinants. Journal of Cleaner Production. doi:10.1016/j.jclepro.2019.118048.
25. Luan F., Cai Z., Wu S., Liu S.Q.*, He Y. (2019) Optimizing the low-carbon flexible job shop scheduling problem with discrete whale optimization algorithm. Mathematics. doi: 10.3390/math7080688.
26. Yan P., Liu S.Q.*, Yang C., Masoud M. (2019). A comparative study on three graph-based construction algorithms for multi-stage scheduling with blocking. Journal of Industrial and Management Optimization, 15 (1), 221-233. doi:10.3934/jimo.2018040. In press. (SCI-4 journal; IF: 1.181; 4 citations)
27. Yan P., Liu S.Q.*, Sun T., Ma K. (2018). A dynamic scheduling approach for optimizing the material handling operations in a robotic cell. Computers & Operations Research, 99, 166-177. doi: 10.1016/j.cor.2018.05.009. (SCI-1 journal; IF: 3.433; 4 citations)
实际指导论文:
28. Masoud, M., Kozan, E., Kent, G. Liu, S.Q. (2017). A new constraint programming approach for optimising a coal rail system. Optimization Letters, 11(4), 725-738. doi:10.1007/s11590-016-1041-5. (SCI 2 Journal; IF: 1.310; 9 citations).
29. Masoud, M., Kozan, E., Kent, G. Liu, S.Q. (2016). Experimental dataset for optimising the freight rail operations, Data in Brief. 9, 452-500. doi: 10.1016/j.dib.2016.09.015.
30. Masoud, M., Kozan, E., Kent, G. Liu, S.Q. (2016). An integrated approach to optimise cane rail operations. Computers & Industrial Engineering. 98, 211-220. (SCI-2 Journal; IF:3.442; 14 citations)
31. Masoud, M., Kent G., Kozan E., Liu. S.Q. (2016). A new multi-objective model to optimise rail transport scheduler. Journal of Transportation Technologies, 6, 86–98. (10 citations)
32. Mousavi, A., Kozan, E., Liu, S.Q. (2016). Open pit block sequencing optimisation: a mathematical model and solution technique. Engineering Optimization, 48(11), 1932-1950. doi: 10.1080/0305215X.2016.1142080. (SCI-3 journal; IF: 1.622; 14 citations)
33. Mousavi, A., Kozan, E., Liu, S.Q. (2016). Comparative analysis of three metaheuristics for short-term open pit block sequencing. Journal of Heuristics, 22(3), 301-329. doi:10.1007/s10732-016-9311-z. (SCI-2 journal; IF: 1.129; 4 citations).
论著
34. Kozan E. & Liu S.Q. (2018) An Open-Pit Multi-Stage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations. In: Dimitrakopoulos R. (eds) Advances in Applied Strategic Mine Planning. Springer, Cham. doi: https://doi.org/10.1007/978-3-319-69320-0_38. (2 citations)
35. Mousavi, A., Kozan, E., Liu, S.Q. (2014). Book Chapter 5: Integrated approach to optimize open-pit mine block sequencing. In B. Bidanda, I. Sabuncuoglu, & B. Y. Kara (Eds.), Industrial Engineering Non-Traditional Applications in International Settings (pp. 83–98). CRC Press, USA. (8 citations)
合作论文:
36. Li W., Wang J., Chen R., Xi Y., Liu S.Q., Wu F., Masoud M., Wu X. (2019) Innovation-driven industrial green development: The moderating role of regional factors. Journal of Cleaner Production, 222, 344–354. (SCI-1 journal; IF: 7.051; 4 citations)
37. Matindi, R., Hobson, P., Masoud, M., Kent, G., Liu, S.Q. (2019). Developing a versatile simulation, scheduling and economic model framework for bioenergy production systems. International Journal of Industrial Engineering Computations, 10, 17-36. doi: 10.5267/j.ijiec.2018.5.003.
38. Allihaibi W., Masoud M., Cholette M., Liu S.Q., Burke J. (2018). A new mathematical approach to optimise an emergency department. Mathematics and Computers in Simulation, Accepted. (SCI-3 journal; IF:1.308)
39. Matindi R., Masoud M., Hobson P., Kent G., Liu S.Q. (2018). Harvesting and transport operations to optimise biomass supply chain and industrial biorefinery processes. International Journal of Industrial Engineering Computations, 9, 265-288. doi: 10.5267/j.ijiec.2017.9.001.
40. Yan P., Che, A., Levner E., Liu S.Q. (2018). A heuristic for inserting randomly arriving jobs into an existing hoist schedule. IEEE Transactions on Automation Science and Engineering. 15(3), 1423-1430. doi: 10.1109/TASE.2017.2749429. (SCI-1 journal; IF: 3.502; 5 citations)
会议论文:
41. Liu S.Q.*, D’Ariano A., Kozan E., Masoud M., Chung S.H., (2019) A classification and literature survey on aviation management A classification and literature survey on aviation management. 8th Int. Conf. Ind. Eng. Syst. Manag. Shanghai, China.
42. Zhang Q., Liu S.Q.*, Masound M. (2019) User equilibrium and system optimum with incomplete information in traffic congestion. 8th Int. Conf. Ind. Eng. Syst. Manag. Shanghai, China.
43. Masoud M., Khalifa H.A., Liu S.Q.*, Elhenawy M., Wu P. (2019) A fuzzy goal programming approach for solving fuzzy multi-objective stochastic linear programming problem. 8th Int. Conf. Ind. Eng. Syst. Manag. Shanghai, China.
44. Allihaibi W., Masoud M., Cholette M., Burke J., Karim A., Liu S.Q. (2017) Optimising the service of emergency department in a hospital. 22nd International Congress on Modelling and Simulation (MODSIM 2017), Hobart, Tasmania, Australia, 1255–1261.
45. Kozan, E., & Liu, S.Q. # (2014). An open pit multistage mine production scheduling model for drilling, blasting and excavating operations. In J. Whittle & R. Dimitrakopoulos (Eds.), Orebody Modelling and Strategic Mine Planning Conference 2014. Perth, Australia.
46. Mousavi, A., Kozan, E., & Liu, S.Q. (2013). Revolutionising open-pit mine block sequencing. In CRC ORE Annual Assembly 2013. Brisbane, Australia.
47. Kozan, E., Liu, S.Q. #, & Wolff, R. (2013). A short-term production scheduling methodology for open-pit mines. In International Symposium on the 36th Applications of Computers and Operations Research in the Mineral Industry (the 36th APCOM) (pp. 465–473). Brazil.
48. Liu, S.Q., & Kozan, E. (2013). An open-pit mine production scheduling methodology. In ASOR Conference 2013. Melbourne, Australia.
49. Mousavi, A., Kozan, E., & Liu, S.Q. (2013). Open-pit mine optimisation. In The 26th European Conference on Operational Research. Rome, Italy.
50. Mousavi, A., Kozan, E., & Liu, S.Q. (2013). An integrated approach to optimise open-pit mine block sequencing. In Proceeding of International IIE. Istanbul, Turkey.
51. Liu, S.Q., & Kozan, E. (2012). Applying the lot-streaming scheduling methodology to mining industry. In CRC ORE Annual Assembly 2012. Brisbane, Australia.
52. Kozan, E., & Liu, S.Q. (2011). A multi-resource multi-stage open-pit mine production scheduling methodology. In CRC ORE Annual Assembly 2011. Brisbane, Australia (Best Technical Paper Award).
53. Liu, S.Q., & Kozan, E. (2009). A new methodology for optimising a coal rail network under capacity constraints: a real-world case study. In ASOR National Conference 2009. Gold Coast, Australia.
54. Liu, S.Q., & Kozan, E. (2007). A blocking parallel-machine job-shop-scheduling model for the train scheduling problem. In the Eighth Asia–Pacific Industrial Engineering and Management Systems Conference (pp. 10.1–10.10). Kaohsiung, Taiwan.