近期论文
查看导师新发文章
(温馨提示:请注意重名现象,建议点开原文通过作者单位确认)
Journal Papers
1.Yi-Feng Hung, Jian-Song Bao and Yu-En Cheng, 2017, "Minimizing earliness and tardiness costs in scheduling jobs with time windows," 16th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS), Vol.113, (SCI).
2.Yi-Feng Hung, Ping-Heng Tsai and Gen-Han Wu, 2014, "Application extensions from the stochastic capacity rationing decision approach," INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Vol. 52(6), (SCI).
3.Yi-Feng Hung, Chao-Ying Chang and Hewen Chen, 2013, “Determining ideal fabric cutting times for apparel manufacturing by mixed integer programming and a heuristic method”, European Journal of Industrial Engineering, Accepted for publication, (SCI).
4.Yi-Feng Hung, Chi-Chung Wang, and Gen-Han Wu, 2013, “Scheduling semiconductor multi-head testers using metaheuristic techniques embedded with lot-specific and configuration-specific information”, Mathematical Problems in Engineering, Vol. 2013, Article ID 436701 (SCI).
5.Yi-Feng Hung, Jui-Yi Hsiao, 2013, “Inventory rationing decision models during replenishment lead time,” International Journal of Production Economics, Vol.144, pp.290-300, (SCI).
6.Yi-Feng Hung, Ping-Heng Tsai and Gen-Han Wu, 2013, “Application extensions from the stochastic capacity rationing decision approach,” International Journal of Production Research, published on-line: http://www.tandfonline.com/doi/full/10.1080/00207543.2013.848043. (SCI).
7.Yi-FengHung, Chien-HaoChen, 2013, “An effective dynamic decision policy for the revenue management of an airline flight,” International Journal of Production Economics, Vol.144, pp.440-450, (SCI).
8.Yi-Feng Hung, Chuan-Che Huang, and Ying Yeh, 2013, “Real-time Capacity Requirement Planning for Make-to-Order Manufacturing with Variable Time-Window Orders”, Computer and Industrial Engineering, Vol.64, pp.641-652, (SCI).
9.Yi-Feng Hung, Chao-Hsiang Liang, and James C. Chen, 2013, “Sensitivity Search for the Rescheduling of Semiconductor Photolithography Operations”, International Journal of Advanced Manufacturing Technology, Vol. 67, pp.73-84, (SCI).
10.Yi-Feng Hung, Wei-Chih Chen, and James C. Chen, 2012, “Search Algorithms in the Selection of Warehouses and Transshipment Arrangements for High-end Low-volume Products,” Journal of Advanced Engineering, Vol. 7, No. 2, pp.51-60.
11.Yi-Feng Hung and Wei-Chih Chen, 2011, “A Heterogeneous Cooperative Parallel Search of Branch-and-Bound Method and Tabu Search Algorithm”, Journal of Global Optimization, Vol. 51, pp.133-148, (SCI).
12.Yi-Feng Hung and Tzu-Yuan Lee, 2010, “Capacity Rationing Decision Procedures with Order Profit as a Continuous Random Variable”, International Journal of Production Economics, Vol. 125, No. 1, pp.125-136, (SCI)
13.Yi-Feng Hung, Juei-Yang Lin, and Wei-Chih Chen, 2008, “Enhanced Parallel Tabu Search with the Memory of Local Optima”, Journal of the Chinese Institute of Industrial Engineers, Vol. 19, No. 1, pp.67-74, (EI).
14.Yi-Feng Hung, Ching-Ping Chen and Chia-Chung Shih, 2003, “Using Tabu Search with Ranking Candidate List to Solve Production Planning Problems with Setups,” Computer and Industrial Engineering, Vol.45, No.4, pp.615-634, (SCI).
Yi-Feng Hung and Ching-Bin Chang, 2002, “Dispatching Rules Using Flow Time Predictions for Semiconductor Wafer Fabrications,” Journal of the Chinese Institute of Industrial Engineers, Vol.19, No.1, pp.67-74, (EI).
16.Yi-Feng Hung and Gia-Jin Cheng, 2002, “Hybrid Capacity Modeling for Alternative Machine Types in Linear Programming Production Planning,” IIE Transactions, Vol.34, No.2, pp.157-16, (SCI).
17.Yi-Feng Hung and Meng-Chi Hou, 2001, “A Production Planning Approach Based on Iterations of Linear Programming Optimization and Flow Time Prediction,” Journal of the Chinese Institute of Industrial Engineers, Vol.18, No.3, pp.55-68.
18.Yi-Feng Hung and Kuo-Liang Chien, 2000, “A Multi-Class Multi-Level Capacitated Lot Sizing Model,” Journal of the Operational Research Society, Vol.51, pp.1309-1318, (SCI).
19.Yi-Feng Hung and I-Hsiu Chen, 2000, “Dynamic Operator Assignment Based on Shifting Machine Loading,” International Journal of Production Research, Vol.38, No.14, pp.3403-3420, (SCI, EI).
20.Yi-Feng Hung and Ching-Bin Chang, 1999, “Using An Empirical Queueing Approach to Predict Future Flow Times,” Computer and Industrial Engineering, Vol.37, No.4, pp.809-821, (SCI).
21.Yi-Feng Hung, Chia-Chung Shih and Ching-Ping Chen, 1999, “Evolutionary Algorithms for Production Planning Problems with Setup Decisions,” Journal of the Operational Research Society, Vol.50, pp.857-866, (SCI).
22.Yi-Feng Hung and Robert C. Leachman, 1999, “Reduced Simulation Models of Wafer Fabrication Facilities,” International Journal of Production Research, Vol.37, No.12, pp.2685 -2701, (SCI, EI).
23.Yi-Feng Hung and Shou-Jong Chen, 1999, “Using Queue Management for Semiconductor Manufacturing Release Control,” Journal of Management and System, Vol.6, No.1, pp.93-110. (in Chinese)
24.Yi-Feng Hung and Ching-Bin Chang, 1999, “Determining Safety Stock for Production Planning in Uncertain Manufacturing,” International Journal of Production Economics, Vol.58, pp.199-208, (SCI, EI).
25.Yi-Feng Hung, 1998, “Real-Time Simulation-based Wafer Fabrication Production Scheduling System,” Engineering Science & Technology Bulletin, NSC, Vol.28, pp.40-43. (in Chinese)
26.Yi-Feng Hung and Ying-Ren Chen, 1998, “A Simulation Study of Dispatch Rules for Reducing Flow Times in Semiconductor Wafer Fabrication,” Production Planning and Control, Vol.9, No.7, pp.714-722, (SCI, EI).
27.Yi-Feng Hung and Yi-Cheng Hu, 1998, “Solving Mixed Integer Programming Production Planning Problems with Setups by Shadow Prices Information,” Computer and Operations Research, Vol.5, No.12, pp.1027-1042, (SCI).
28.Yi-Feng Hung, 1998, “Scheduling of Mask Shop E-Beam Writers,” IEEE Transactions on Semiconductor Manufacturing, Vol.11. No.1, pp.165-172, (SCI, EI).
29.Yi-Feng Hung and Qi-Zong Wang, 1997, “A New Formulation Technique for Alternative Material Planning - An Approach for Semiconductor Bin Allocation Planning,” Computer and Industrial Engineering, Vol.32, No.2, pp.281-297, (SCI).
Yi-Feng Hung and Robert C. Leachman, 1996, “A Production Planning Methodology for Semiconductor Manufacturing Based on Iterative Simulation and Linear Programming Calculation,” IEEE Transactions on Semiconductor Manufacturing, Vol.9, No.2, pp.257-269, (SCI, EI).
Conference Papers
1.Yi-Feng Hung, May 18-20, 2007, “Order assignments for a global apparel production network”, The 2nd International Conference on Operations and Supply Chain Management (OSCM) 2007, Bangkok, Thailand.
2.Yi-Feng Hung and Ching-Bin Chang, 2000, December 13-15, “Dispatching Rules Using Flow Time Predictions for Semiconductor Wafer Fabrications,” The 5th Annual International Conference on Industrial Engineering – Theory, Applications, and Practice, National Tsing Hua University, Hsinchu, Taiwan, R.O.C.
3.洪一峯,周秀玉,1999,June 25,“電子光束機批量排程”,生產排程理論與應用研討會,新竹。The 1999 Conference on Production Scheduling: Theory and Its Applications,Hsinchu,Taiwan。
4.Yi-Feng Hung and Ching-Bin Chang, 1997, October 13-15, “A Study of Wafer Fab Dispatching Rules Based on Empirical Flow Time Predictions,” Twenty-First International Electronics Manufacturing Technology Symposium, Austin, Texas, U.S.A.
5.洪一峯,陳英仁,張慶彬,85年12月,“縮短流程時間之晶圓製造廠派工法則”,中國工業工程學會八十五年年會。
6.洪一峯,施欣玫,陳靜萍,85年12月,“半導體生產計劃演算法之研究”,中國工業工程學會八十五年年會。
7.Yi-Feng Hung, 1996, October 14-16, “Determining Safety Stock for Semiconductor Manufacturing,” Nineteenth International Electronics Manufacturing Technology Symposium, Austin, Texas, U.S.A.
8.Yi-Feng Hung and Jui-Ling Yang, 1996, October 14-16, “Scheduling Jobs with Machine- Dependent Processing Times,” Nineteenth International Electronics Manufacturing Technology Symposium, Austin, Texas, U.S.A.
9.Yi-Feng Hung and Robert C. Leachman, 1995, October, “The Relationship Between Cycle Time and Safety Stock for Semiconductor Manufacturing,” IEEE Transactions/1995 Semiconductor Manufacturing Workshop, Taiwan.
10.Yi-Feng Hung, 1990, August, “Analysis of Reduced Factory Models to Set Parameters of the Company-Wide Production Planning Model,” Fifth Annual SRC/DAPRA CIM-IC Workshop, U.S.A.
11.Yi-Feng Hung and S. Adiga, 1988, August, “Knowledge-Based Simulation System for A wafer Fabrication Shop,” ASME 1988 Computer in Engineering Conference, U.S.A.