近期论文
查看导师新发文章
(温馨提示:请注意重名现象,建议点开原文通过作者单位确认)
周扬.Stochastic dynamic response and seismic reliability analysis of nuclear power plant's vertical re...[J],Structures,2021,131(6):513-539
刘俊.Dynamic analysis of functionally graded sandwich beams using a method named scaled finite element...[J],Engineering Analysis with Boundary Elements,2021,130(9):161-175
周扬.Seismic fragility analysis of high concrete faced rockfill dams based on plastic failure with sup...[J],Soil Dynamics and Earthquake Engineering,2021,144(106587):1-10
龚瑾.A Non-Matching Nodes Interface Model with Radial Interpolation Function for Simulating 2D Soil-St...[J],International Journal of Computational Methods,2021,18(20500231):1-33
周扬.Seismic Analysis for Nuclear Power Safety Related Bridge[J],KSCE JOURNAL OF CIVIL ENGINEERING,2021,25(2):631-645
邹德高.An approach for the real-time slip deformation coupled with strain softening of a high rockfill...[J],SOIL DYNAMICS AND EARTHQUAKE ENGINEERING,2021,117:30-46
臧全胜.On Investigation of Liquid Sloshing in Cylindrical Tanks With Single and Multiply Connected Domai...[J],Journal of Pressure Vessel Technology,2021,143(021402):1-14
周扬.Seismic Analysis for Nuclear Power Safety Related Bridge[J],KSCE Journal of Civil Engineering,2020,1-15
邹德高.非岩性地基条件下核岛厂房-桩-土非线性动力相互作用特性研究[J],核动力工程,2020,41(02):59-65
周扬.去学沥青混凝土心墙坝高基座体型研究[J],水电能源科学,2020,38(03):71-73
邹德高,陈楷,刘锁,周扬.非线性比例边界有限元在面板坝分析中的应用[J],土木与环境工程学报(中英文),2019,41(3):11-18
孔宪京,庞锐,徐斌,周扬,邹德高.考虑堆石料软化的坝坡随机地震动力稳定分析[J],岩土工程学报,2018,41(3):414-421
Xu, Bin,Wang, Xingliang,Pang, Rui,Zhou, Yang.Influence of strong motion duration on the seismic performance of high CFRDs based on elastopla...[J],SOIL DYNAMICS AND EARTHQUAKE ENGINEERING,2018,114:438-447
Chen, Kai,Zou, Degao,Zhou, Yang,Kong, Xianjing.Global concurrent cross-scale nonlinear analysis approach of complex CFRD systems considering d...[J],SOIL DYNAMICS AND EARTHQUAKE ENGINEERING,2018,114:51-68
Xu, Bin,Zhou, Yang,Zhou, Chenguang,Kong, Xianjing,Zou, Degao.Dynamic responses of concrete-faced rockfill dam due to different seismic motion input methods[J],INTERNATIONAL JOURNAL OF DISTRIBUTED SENSOR NETWORKS,2018,14(10)
Xu, Bin,Liu, Jingmao,Yu, Xiang,Zhou, Yang.A three-dimensional elasto-plastic dynamic response procedure for concrete-faced rockfill dams[J],INTERNATIONAL JOURNAL OF DISTRIBUTED SENSOR NETWORKS,2018,14(8)
Zhou, Yang,Xu, Bin,Pang, Rui,Zou, Degao,Kong, Xianjing.Stochastic seismic response and stability reliability analysis of a vertical retaining wall in ...[J],NUCLEAR ENGINEERING AND DESIGN,2018,334:110-120
邹德高,隋翊,周扬,孔宪京,刘鑫,龚涛.核电厂桥梁结构-地基动力相互作用精细化分析[J],大连理工大学学报,2018,58(4):407-413
Pang, Rui,Xu, Bin,Kong, Xianjing,Zou, Degao,Zhou, Yang.Seismic reliability assessment of earth-rockfill dam slopes considering strain-softening of roc...[J],SOIL DYNAMICS AND EARTHQUAKE ENGINEERING,2018,107:96-107
Jia, Yufeng,Xu, Bin,Chi, Shichun,Xiang, Biao,Zhou, Yang.Research on the Particle Breakage of Rockfill Materials during Triaxial Tests[J],INTERNATIONAL JOURNAL OF GEOMECHANICS,2017,17(10)
Xu, Bin,Zou, Degao,Kong, Xianjing,Zhou, Yang,Liu, Xiaoping.Concrete Slab Dynamic Damage Analysis of CFRD Based on Concrete Nonuniformity[J],INTERNATIONAL JOURNAL OF GEOMECHANICS,2017,17(9)
孔宪京,庞锐,邹德高,徐斌,周扬.基于IDA的高面板堆石坝抗震性能评价[J],岩土工程学报,2017,40(6):978-984
周扬,周晨光,徐斌.Research on Pullout Behavior of Geogrid under Rockfill Materials[A],2017,1-8
邹德高,周扬,韩慧超,孔宪京.近断层脉冲型地震动作用下面板堆石坝的动力响应[J],水利学报,2016,48(1):78-85
董博文,邹德高,周晨光,刘京茂,周扬.堆石料与土工格栅间拉拔特性试验研究[J],水利与建筑工程学报,2016,14(4):50-54
孔宪京,张争超,邹德高,刘京茂,周扬.基于P-Z模型的直立墙振动台试验数值模拟[J],地震工程学报,2016,38(3):333-337,352
孔宪京,许贺,邹德高,胡志强,周扬.不同激振方向下动水压力对高面板坝面板动应力的影响[J],水利学报,2016,47(9):1153-1159
周扬,邹德高,徐斌,滕晓威,孔宪京.考虑堆石料软化特性的坝坡动力稳定和滑移变形分析[J],岩土工程学报,2016,38(9):1713-1719
邹德高,刘京茂,孔宪京,周扬,杨小龙.西域砾岩砂砾料沥青混凝土心墙坝湿化变形数值分析[J],大连理工大学学报,2015,55(6):605-611
Yu, Xiang,Hu, Zhiqiang,Kong, Xianjing,Zou, Degao,Zhou, Yang.Linear elastic and plastic-damage analyses of a concrete cut-off wall constructed in deep overb...[J],COMPUTERS AND GEOTECHNICS,2015,69(69):462-473
Xu, Bin,Zou, Degao,Kong, Xianjing,Hu, Zhiqiang,Zhou, Yang.Dynamic damage evaluation on the slabs of the concrete faced rockfill dam with the plastic-dama...[J],COMPUTERS AND GEOTECHNICS,2015,65:258-265
徐斌,李云清,周扬,单其宽.地震作用下混凝土高趾墙损伤分析[J],水电能源科学,2014,11:67-71
赵士强,邓学晶,周扬.高土石坝随机地震反应分析[J],低温建筑技术,2014,36(7):41-44
Xu, Bin,Zhou, Yang,Zou, Degao.Numerical Simulation on Slabs Dislocation of Zipingpu Concrete Faced Rockfill Dam during the We...[J],SCIENTIFIC WORLD JOURNAL,2014,2014:572407
孔宪京,余翔,邹德高,周扬.沥青混凝土心墙坝三维有限元静动力分析[J],大连理工大学学报,2014,54(2):197-203
周扬,余钧陶.土工格栅加筋对高土石坝坝坡地震稳定性影响研究[J],水电能源科学,2014,02:72-75
邹德高,周扬,孔宪京,徐斌.基于Newmark法的紫坪铺大坝面板错台研究[A],2013,268-276
Liu, Y.W.,Zhou, Y..Seismic rotations and rotational seismic input for building design[J],Applied Mechanics and Materials,2013,405-408:1953-1956
孔宪京,邹德高,徐斌,周扬,刘京茂.紫坪铺面板堆石坝三维有限元弹塑性分析[J],水力发电学报,2013,32(2):213-222
Zou, Degao,Xu, Bin,Kong, Xianjing,Liu, Huabei,Zhou, Yang.Numerical simulation of the seismic response of the Zipingpu concrete face rockfill dam during ...[J],COMPUTERS AND GEOTECHNICS,2013,49:111-122
余钧陶,周扬,李永胜.筋土接触面直剪试验研究[J],低温建筑技术,2012,34(12):97-98
孔宪京,周扬,邹德高,徐斌.汶川地震紫坪铺面板堆石坝地震波输入研究[J],岩土力学,2012,33(7):2110-2116
Zou, Degao,Zhou, Yang,Ling, Hoe I.,Kong, Xianjing,Xu, Bin.DISLOCATION OF FACE-SLABS OF ZIPINGPU CONCRETE FACE ROCKFILL DAM DURING WENCHUAN EARTHQUAKE[J],JOURNAL OF EARTHQUAKE AND TSUNAMI,2012,6(2)
邹德高,徐斌,孔宪京,刘京茂,周扬.基于广义塑性模型的高面板堆石坝静、动力分析[J],水力发电学报,2011,30(6):109-116
孔宪京,周扬,邹德高,徐斌.高面板堆石坝面板应力分析及抗挤压破坏措施[J],水力发电学报,2011,30(6):153-158,257
Kong Xianjing,Zhou Yang,Zou Degao,Xu Bin,Yu Long.Numerical analysis of dislocations of the face slabs of the Zipingpu Concrete Faced Rockfill Da...[J],EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION,2011,10(4):581-589
Zhou, Yang,Zou, De Gao,Kong, Xian Jing,Fu, Meng.Study on Compressive Stress of Face Slab of Ultra-high Concrete Face Rockfill Dam[A],2011,105-107:1420-+
孔宪京,周扬,邹德高,徐斌.高面板堆石坝面板应力分析及抗挤压破坏措施[A],2011,208-213
邹德高,徐斌,孔宪京,刘京茂,周扬.基于广义塑性模型的高面板堆石坝静、动力分析[A],2011,214-220
Xu Bin,Luo Wei,Zou Degao,Kong Xianjing,Zhou Yang.The Numerical Simulation of the Triaxial Test of Cemented Coarse-grained Soils[A],2011,250-253(1-4):2640-+
邹德高,周扬,孔宪京,徐斌,毛雯娟.高土石坝加速度响应的三维有限元研究[A],2011,656-661
邹德高,周扬,孔宪京,徐斌,毛雯娟.高土石坝加速度响应的三维有限元研究[J],岩土力学,2011,S1:656-661
Zou D.-G.,Zhou Y.,Kong X.-J.,Xu B.,Mao W.-J..3D FEM study of acceleration response of high earth-rock dams[J],Yantu Lixue/Rock and Soil Mechanics,2011,32(SUPPL. 1):656-661
孔宪京,周扬,邹德高,徐斌.汶川地震余震记录及紫坪铺面板堆石坝余震反应研究[J],岩土工程学报,2011,33(5):673-678
Kong X.-J.,Zhou Y.,Xu B.,Zou D.-G..Analysis on seismic failure mechanism of Zipingpu dam and several reflections of aseismic design ...[A],2010,3177-3189