SCI/SSCI期刊论文
[57] Feifeng Zheng, Xiaoyi Man, Feng Chu, Ming Liu*, Chengbin Chu, A two-stage stochastic programming for single yard crane with uncertain release times of retrieval tasks[J]. International Journal of Production Research, 57(13): 4132-4147, 2019.
[56] Ming Liu, Xin Liu, Maoran Zhu, Feifeng Zheng, Stochastic Drone Fleet Deployment and Planning Problem Considering Multiple-Type Delivery Service[J]. Sustainability, 2019, 11, doi:10.3390/su11143871, 2019.
[55] Ming Liu, Xin Liu, Feng Chu*, Feifeng Zheng, Chengbin Chu, Service-oriented robust parallel machine scheduling[J]. International Journal of Production Research, 57(12): 3814-3830, 2019.
[54] Feifeng Zheng, Ying Li, Feng Chu, Ming Liu*, Integrated berth allocation and quay crane assignment with maintenance activities[J]. International Journal of Production Research, 57(11): 3478-3503, 2019.
[53] Ming Liu, Xin Liu, Feng Chu*, Feifeng Zheng, Chengbin Chu, Distributionally robust inventory routing problem to maximize the service level under limited budget[J]. Transportation Research Part E: Logistics and Transportation Review. 126: 190-211, 2019.
[52] Xiaozhou He, Zhihui Liu, Bing Su, Yinfeng Xu, Feifeng Zheng, Binhai Zhu, Efficient algorithms for computing one or two discrete centers hitting a set of line segments[J]. Journal of Combinatorial Optimization, 37(4): 1408-1423, 2018.
[51] Feifeng Zheng, Mike L. Pinedo, Kangbok Lee, Ming Liu*, Yinfeng Xu, Toward robustness of response time: the maximum inter-completion time minimization scheduling problem[J]. International Journal of Production Research, 57(1): 182-199, 2019.
[50] Guanqun Ni*,Feifeng Zheng, Yinfeng Xu, Competitive analysis of online revenue management with hierarchical resources[J]. Information Processing Letters, 142: 41-45, 2019.
[49] E Zhang, Ming Liu*, Feifeng Zheng, Yinfeng Xu, Single machine lot scheduling to minimize the total weighted (discounted) completion time[J]. Information Processing Letters, 142: 46-51, 2019.
[48] Feifeng Zheng, Junkai He, Feng Chu, Ming Liu*, A new distribution-free model for disassembly line balancing problem with stochastic task processing times[J]. International Journal of Production Research, 56(24): 7341-7353, 2018.
[47] Feifeng Zheng, Xiaoyi Man, Feng Chu, Ming Liu*, Chengbin Chu, Two yard crane scheduling with dynamic processing time and interference[J]. IEEE Transactions on Intelligent Transportation Systems, 12(19): 3775-3784, 2018.
[46] Kangbok Lee, Feifeng Zheng, Mike L. Pinedo*, Online Scheduling of Ordered Flow Shops[J]. European Journal of Operational Research, 272(1): 50-60, 2019.
[45] Xiaogang Jiao, Feifeng Zheng, Ming Liu*, Yinfeng Xu, Integrated berth allocation and time-variant quay crane scheduling with tidal impact in approach channel[J]. Discrete Dynamics in Nature and Society, V2018, Article ID 9097047, 19 pages,https://doi.org/10.1155/2018/9097047.
[44] E Zhang, Qihuang Mei, Ming Liu*, Feifeng Zheng, Stowage Planning in Multiple Ports with Shifting Fee Minimization[J]. Scientific Programming, Vol. 2018, Article ID 3450726, 9 pages, 2018
[43] Jidan Huang, Feifeng Zheng, Yinfeng Xu, Ming Liu, Online MapReduce processing on two identical parallel machines[J]. Journal of Combinatorial Optimization, 35(1): 216-223, 2018.
[42] Ming Liu, Shijin Wang, Feifeng Zheng, Chengbin Chu, Algorithms for joint multitasking scheduling and common due date assignment problem[J]. International Journal of Production Research, 55(20): 6052-6066, 2017.
[41] Zhanguo Zhu,Feifeng Zheng, Chengbin Chu, Multitasking scheduling problems with a rate-modifying activity[J].International Journal of Production Research, 55(1): 296-312, 2017.
[40] Wenming Zhang, E Zhang,Feifeng Zheng, Online Two Stage k-Search Problem and Its Competitive Analysis [J].International Journal of Foundations of Computer Science, 27(6): 653-663, 2016.
[39] Xin Feng,Feifeng Zheng, Yinfeng Xu, Robustschedulingofatwo-stage hybridflowshopwith uncertaininterval processingtimes[J].International Journal of Production Research, 54(12): 3706-3717, 2016.
[38] Xin Feng, Yongxi Cheng,Feifeng Zheng, Yinfeng Xu, Online integrated production–distribution scheduling problems without preemption[J].Journal of Combinatorial Optimization, 31(1): 1569-1585, 2016.
[37] Wenming Zhang, E Zhang,Feifeng Zheng, Online (J, K)-search problem and its competitive analysis[J].Theoretical Computer Science, 593(16):139-145, 2015.
[36]Feifeng Zheng, Li Luo, E Zhang, NF-based algorithms for online bin packing with buffer and bounded item size[J].Journal of Combinatorial Optimization, 30(2): 360-369, 2015.
[35] Yongxi Cheng, Ju’e Guo,Feifeng Zheng, A new randomized algorithm for group testing with unknown number of defective items[J].Journal of Combinatorial Optimization, 30(1): 150-159, 2015.
[34] Yongxi Cheng, Ding-Zhu Du,Feifeng Zheng, A new strongly competitive group testing algorithm with small sequentiality[J].Annals of Operations Research, 229(1):265-286, 2015.
[33] Ming Liu,Feifeng Zheng(通讯), Jinfeng Li, Scheduling small number of quay cranes with non-interference constraint[J].Optimization Letters, 9(2):403-412, 2015
[32] Ming Liu,Feifeng Zheng, Zhanguo Zhu, Chengbin Chu, Optimal semi-online algorithm for scheduling on two parallel batch processing machines[J].Asia-Pacific Journal of Operational Research, 31(5): 1450038, 2014.
[31] Stanley P. Y. Fung, Chung Keung Poon,Feifeng Zheng,Improved Randomized Online Scheduling of Intervals and Jobs[J].Theory of Computing Systems, 55(1): 202-228, 2014.
[30]Feifeng Zheng, Yinfeng Xu, Weimin Ma, E Zhang, Online scheduling with immediate and reliable lead-time quotation[J].Journal of Scheduling, 17(3):225-236, 2014.
[29]Feifeng Zheng, Yinfeng Xu, E Zhang, WeiChiang Hong, Competitive analysis for make-to-order scheduling with reliable lead time quotation[J].Journal of Combinatorial Optimization, 27(1):182-198, 2014.
[28]Feifeng Zheng, Yongxi Cheng, Yinfeng Xu, Ming Liu,Competitive strategies for an online generalized assignment problem with a service consecution constraint[J].European Journal of Operational Research, 229(1):59-66, 2013.
[27]Feifeng Zheng, Yongxi Cheng, Ming Liu, Yinfeng Xu, Online interval scheduling on a single machine with finite lookahead[J].Computers & Operations Research, 40(1):180-191, 2013.
[26] Ming Liu,Feifeng Zheng, Shijin Wang, Yinfeng Xu, Approximation algorithms for parallel machine scheduling with linear deterioration[J].Theoretical Computer Science,497(29):108-111, 2013.
[25]Feifeng Zheng, Liu Ming, Chu Chengbin, Xu Yinfeng, Online Parallel Machine Scheduling to Maximize the Number of Early Jobs[J].Mathematical Problems in Engineering,DOI: 10.1155/2012/939717, 2012.
[24] Ming Liu,Feifeng Zheng(通讯), Shijin Wang, Jiazhen Huo,Optimal algorithms for online single machine scheduling with deteriorating jobs[J].Theoretical Computer Science,445(3):75-81,2012.
[23] Ming Liu,Feifeng Zheng(通讯), Chengbin Chu, Yinfeng Xu, Single-machine scheduling with past-sequence-dependent delivery times and release times[J].Information Processing Letters, 112(21):835-838, 2012.
[22] Ming Liu,Feifeng Zheng, Chengbin Chu, Jiantong Zhang, An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration[J].Journal of Combinatorial Optimization, 23(4): 483-492, 2012.
[21] Wenming Zhang, Yinfeng Xu,Feifeng Zheng, Yucheng Dong, Optimal algorithms for online time series search and one-way trading with interrelated prices[J].Journal of Combinatorial Optimization, 23(2):159-166, 2012.
[20] Ming Liu,Feifeng Zheng, Chengbin Chu, Yinfeng Xu, New results on single-machine scheduling with past-sequence-dependent delivery times[J].Theoretical Computer Science, 438:55-61, 2012.
[19] Wenming Zhang, Yinfeng Xu,ZhengFeifeng, Yucheng Dong, Online algorithms for the multiple time series search problem[J].Computers & Operations Research, 39(5):929-938, 2012.
[18]Feifeng Zheng, Yinfeng Xu, Chung Keung Poon, E Zhang, Xiaoping Wu, Online deadline scheduling with preemption penalties[J].Computers & Industrial Engineering, 60(4):542-549, 2011.
[17] Ming Liu,Feifeng Zheng, Chengbin Chu, Yinfeng Xu, Optimal algorithms for online scheduling on parallel machines to minimize the makespan with a periodic availability constraint[J].Theoretical Computer Science, 412(39): 5225-5231, 2011.
[16] Wei-Chiang Hong, Yucheng Dong,Feifeng Zheng, Shih-Yung Wei, Hybrid evolutionary algorithms in a SVR traffic flow forecasting model[J].Applied Mathematics and Computation, 217(15):6733-6747, 2011.
[15] Wei-Chiang Hong, Yucheng Dong,Feifeng Zheng, Chien-Yuan Lai, Forecasting urban traffic flow by SVR with continuous ACO[J].Applied Mathematical Modelling, 35(3):1282-1291, 2011.
[14] Yinfeng Xu, Wenming Zhang,Feifeng Zheng, Optimal algorithms for the online time series search problem[J].Theoretical Computer Science, 412(3):192-197, 2011.
[13] Wenming Zhang, Yinfeng Xu,Feifeng Zheng, Ming Liu, Online algorithms for the general k-search problem[J].Information Processing Letters, 111(14):678-682, 2011.
[12] Ming Liu, Chengbin Chu, Yinfeng Xu,Feifeng Zheng, Semi-online scheduling on 2 machines under a grade of service provision with bounded processing times[J].Journal of Combinatorial Optimization, 21(1):138-149, 2011.
[11] Ming Liu, Chengbin Chu, Yinfeng Xu,Feifeng Zheng, An optimal online algorithm for two-machine open shop preemptive scheduling with bounded processing times[J].Optimization Letters, 4(2):227-237, 2010.
[10] Ming Liu, Chengbin Chu, Yinfeng Xu,Feifeng Zheng, An optimal online algorithm for single machine scheduling with bounded delivery times[J].European Journal of Operational Research, 201(3):693-700, 2010.
[9] Ming Liu, Yinfeng Xu, Chengbin Chu,Feifeng Zheng, Online scheduling on two uniform machines to minimize the makespan[J].Theoretical Computer Science, 410(21-23):2099-2109, 2009.
[8] Ming Liu, Chengbin Chu, Yinfeng Xu,Feifeng Zheng, Online scheduling on m uniform machines to minimize total (weighted) completion time[J].Theoretical Computer Science, 410(38-40):3875-3881, 2009.
[7] Ming Liu, Chengbin Chu, Yinfeng Xu,Feifeng Zheng, Online scheduling to minimize modified total tardiness with an availability constraint[J].Theoretical Computer Science,410(47-49):5039-5046, 2009.
[6] Stanley P.Y. Fung, Chung Keung Poon,Feifeng Zheng, Online Interval Scheduling: Randomized and Multiprocessor Cases[J],Journal of Combinatorial Optimization, 16(3): 248-262, 2008.
[5]Feifeng Zheng, Yinfeng Xu, E Zhang, How much can lookahead help in online single machine scheduling[J].Information Processing Letters, 106(2): 70-74, 2008.
[4] Stanley P.Y. Fung,Feifeng Zheng, W.T. Chan, Francis Y.L. Chin, Chung Keung Poon and Prudence W.H. Wong, Improved On-line Broadcast Scheduling with Deadlines[J].Journal of Scheduling, 11:299-308, 2008.
[3]Feifeng Zheng, Yinfeng Xu, E Zhang, On-line production order scheduling with preemption penalties[J].Journal of Combinatorial Optimization, 13(2):189-204, 2007.
[2] Chung Keung Poon,Feifeng Zheng, Yinfeng Xu, On-demand Bounded Broadcast Scheduling with Tight Deadlines[J].International Journal of Foundations of Computer Science, 18(2): 251-262, 2007.
[1]Feifeng Zheng, Francis Y.L. Chin, Stanley P.Y. Fung, Chung Keung Poon, Yinfeng Xu, A tight lower bound for job scheduling with cancellation[J].Information Processing Letters, 16, 97 (1): 1-3, 2006.
其他英文期刊论文
[3] Ming Liu,Feifeng Zheng, Yinfeng Xu, Chengbin Chu, Approximation algorithm for uniform quay crane scheduling at container ports[J].Discrete Mathematics, Algorithms and Applications. 8(2): 1-9, 2016.
[2] Ming Liu, Yinfeng Xu, Chengbin Chu,Feifeng Zheng, Online scheduling of parallel jobs with bounded processing times on two machines[J]. Discrete Mathematics, Algorithms and Applications, 2: 425-432, 2010.
[1]Feifeng Zheng, Yinfeng Xu, E Zhang, The On-line Container Shipment Problem and Its Competitive Algorithm[J].Journal of Systems Science and Information, 1(4):515–523, 2003.
国际会议论文
[24] Xiaozhou He, Zhihui Liu, Bing Su, Yinfeng Xu, Feifeng Zheng, Binhai Zhu, Hitting a Set of Line Segments with One or Two Discrete Centers,CCCG 2018, Winnipeg, Manitoba, Canada, pp. 85-90, August 8-10, 2018.
[23] Xiaoyi Man, Feifeng Zheng, Ming Liu, Two Yard Crane Scheduling with Real Time Reshuffle and Safety (abstract), 2018 INFORMS International Conference, Taipei, Taiwan, June 17-20, 2018.
[22] Ming Liu, Xiaoyi Man, Feifeng Zheng, Chengbin Chu, An integer programming model for the single container loading problem with axle weight constraints[C]. 14th International Conference on Services Systems and Services Management (ICSSSM2017), Dalian, China, Article no. 7996151, 16-18, July, 2017. (EI)
[21] Ming Liu, Junkai He, Feifeng Zheng, Chengbin Chu, Multitasking scheduling with energy cost[C]. 7th International Conference on Industrial Engineering and Systems Management (IESM2017), 11-13, Oct, Saarbrucken, Germany, pp. 238-243, 2017.
[20]Feifeng Zheng, Xiaoyi Man, Ming Liu, Feng Chu, Yard crane scheduling with reshuffles in an import container block[C]. 46thInternational Conference on Computers & Industrial Engineering (CIE2016), 29-31 Oct, Tianjin, China, 8pages, 2016.
[19]Feifeng Zheng, Jidan Huang, Ming Liu, Feng Chu, Port truck scheduling on a dedicated transportation route at a container terminal[C]. 46thInternational Conference on Computers & Industrial Engineering (CIE2016), 29-31 Oct, Tianjin, China, 8pages, 2016.
[18]Feifeng Zheng, Ying Li, Ming Liu, An Integrated Scheduling of Berth and Quay Cranes with Maintenance Activities (extended abstract)[C]. LOGMS 2016, 20-23, June, Sydney, Australia, 4pages, 2016.
[17]Feifeng Zheng, Zizhen Zhang, Yanzhi Li and Songshan Guo, The Quay Crane Scheduling Problem with Steel Rope Renewals (extended abstract) [C]. LOGMS 2016, 20-23, June, Sydney, Australia, 4pages, 2016.
[16]Feifeng Zheng, Kangbok Lee, Michael L. Pinedo, Online Scheduling of Ordered Flow shops (abstract)[C]. MOPTA 2016, 17-19, Aug, Bethlehem, USA, 2016.
[15]Feifeng Zheng, Longliang Qiao, Ming Liu, An online model of berth and quay crane integrated allocation in container terminals[C].COCOA2015, Houston, Texas, USA, LNCS 9486, 721-730, 2015. DEC(EI)
[14]Xin Feng,Yinfeng Xu,Feifeng Zheng, Online Scheduling for Electricity Cost in Smart Grid[C].COCOA2015, Houston, Texas, USA, LNCS 9486, 783-793, 2015. DEC(EI)
[13]Feifeng Zheng, Luo Li, Zhang E, NF-based algorithms for online bin packing with buffer and item size limitation[C].COCOA2013, Chengdu, China, LNCS8287, pp.25-36, 2013.(EI)
[12] Xin Feng,Feifeng Zheng, Integrated job scheduling with parallel-batch processing and batch deliveries[C].COCOA2013, Chengdu, China, LNCS8287, pp.72-83, 2013.(EI)
[11] Ming Liu,Feifeng Zheng, Chengbin Chu, An FPTAS for batch scheduling with deterioration effect[C].in 9th IEEE International Conference on Networking, Sensing and Control (ICNSC2012), pp.322-327, 2012.(EI)
[10]Feifeng Zheng, Honglong Wei, Yinfeng Xu, Ming Liu, Online scheduling on two parallel identical machines with a non-clairvoyant disruption[C].CDMMS2011, Hangzhou, China, Applied Mechanics and Materials, 88-89: 264-268, 2011.(EI)
[9] Ming Liu,Feifeng Zheng, Yinfeng Xu, Lu Wang, Heuristics for parallel machine scheduling with deterioration effect[C].COCOA2011, Huangshan, China, LNCS6831, pp.46-51, 2011.(EI)
[8] Sheng Yu, Yinfeng Xu, Ming Liu,Feifeng Zheng, Optimal policy for single-machine scheduling with deterioration effects, learning effects, setup times, and availability constraints[C].COCOA2011, Huangshan, China, LNCS6831, pp.64-73, 2011.(EI)
[7]Feifeng Zheng, Bo Liu, Yinfeng Xu, Online Splitting Interval Scheduling on m Identical Machine[C].AAIM2010, Weihai, China, LNCS6124, pp.304-313, 2010.(EI)
[6] Xiaoping Wu,Feifeng Zheng, Xiaoyu Long, The efficiency loss of user equilibrium with linear non-separable and asymmetric latency functions[C].ISME’2010, Xi’an, vol.2, pp.385-388, 2010.(EI)
[5]Feifeng Zheng, Yinfeng Xu, Chung Keung Poon, On job scheduling with preemption penalties[C].AAIM2009, San Francisco, CA, USA, LNCS5564, pp.315-325, 2009.(EI)
[4] Stanley P.Y. Fung, Chung Keung Poon,Feifeng Zheng, Improved Randomized Online Scheduling of Unit Length Intervals and Jobs[C].WAOA2008, Karlsruhe, Germany, LNCS5426, pp.53-66, 2009.(EI)
[3]Feifeng Zheng, E Zhang, Yinfeng Xu, Xiaoping Wu, An Optimal Strategy for Online Non-uniform Length Order Scheduling[C].AAIM’08, Shanghai, LNCS5034, pp.328-336, 2008.(EI)
[2]Feifeng Zheng, Stanley P.Y. Fung, Wun-Tat Chan, Francis Y.L. Chin, Chung Keung Poon and Prudence W.H. Wong, Improved On-line Broadcast Scheduling with Deadlines [C]. inCOCOON'2006, LNCS 4112, Taipei, Taiwan, pp.320-329, 2006. (SCI, EI)
[1]Feifeng Zheng, Wenqiang Dai, Peng Xiao, Yun Zhao, Competitive Strategies for On-line Production Order Disposal Problem[C].AAIM2005, LNCS 3521, Xi’an, China, pp.46-54, 2005. (SCI, EI)
国内权威期刊论文
[29]黄基诞,郑斐峰,徐寅峰,刘明. 考虑运输时间的MapReduce模型下的同类机调度研究[J]. 系统科学与数学, 2019, 39(11): 1741-1755.
[28] 郑斐峰,蒋娟,梅启煌,最小集装箱运输成本的配载优化研究[J]. 计算机科学,46(6): 239-245, 2019.
[27] 黄基诞,郑斐峰,徐寅峰,刘明,基于MapReduce模型带任务分割的平行机调度优化[J]. 控制与决策, 34(7): 1514-1520, 2019.
[26] 黄基诞,郑斐峰,徐寅峰,刘明,基于MapReduce模型的带准备时间平行机调度优化[J]. 系统工程理论与实践,39(1): 174-182, 2019.
[25] 郑斐峰,梅启煌,刘明,张小宁,多港口集装箱配载的双目标精确算法研究[J]. 工业工程,21(6): 1-6, 2018.
[24] 郑斐峰,梅启煌,王璐,张小宁,内地多港口间的集装箱装配最优方案[J]. 计算机工程与设计, 39(6): 1761-1766, 2018.
[23] 郑斐峰,梅启煌,刘明,张小宁,基于遗传算法与贪婪策略的多港口集装箱配载研究[J].运筹与管理, 27(5): 1-7, 2018.
[22] 郑斐峰,何俊凯,刘明,基于Epsilon约束算法的短纤维生产调度的双目标优化研究[J]. 运筹与管理, 27(3): 1-8, 2018.
[21] 李英,乔龙亮,郑斐峰,具有预知信息的集装箱码头泊位与岸桥联合调度在线模型[J]. 运筹学学报,22(3):28-36. 2018.
[20]郑斐峰,乔龙亮,黄基诞,有限预知信息下集装箱码头泊位与岸桥联合在线调度研究[J].系统管理学报,27(1): 1-9, 2018.
[19]郑斐峰,乔龙亮,预知信息下集装箱码头资源联合调度在线策略研究[J].运筹与管理, 25(4):101-105, 2016.
[18]冯鑫,郑斐峰,徐寅峰,批加工生产配送二级供应链协同调度[J].系统管理学报, 24(2):275-279, 2015.
[17]冯鑫,郑斐峰,面对单客户的生产与配送二级供应链协同调度探讨[J].运筹与管理, 23(4):19-24, 2014.
[16]张娥,郑斐峰,刘亚旭,汪应洛,供大于求时关键字广告位拍卖保留价设计研究[J].预测,30(2):40-45, 2011.
[15]倪冠群,徐寅峰,郑斐峰,网上一口价在线拍卖的定价策略设计[J].管理科学学报, 14(3):1-9, 2011.
[14]余昇,徐寅峰,郑斐峰,太湖水华危机应急预案在线风险补偿启动策略[J].运筹与管理, 20(2):117-124, 2011.
[13]徐寅峰,曹永峰,郑斐峰,单水库在线发电调度策略设计与分析[J].运筹与管理,20(6):82-87, 2011.
[12]余昇,徐寅峰,董玉成,郑斐峰,基于在线方法的蓝藻危机应急预案启动策略[J].系统工程理论与实践,31(5): 914-919, 2011.
[11]郑斐峰,徐寅峰,张娥,占线订单排序D-收益函数下改进的随机策略[J].系统管理学报, 19(1):93-95, 2010.
[10]徐寅峰,余昇,郑斐峰,有阈值约束的占线订单加工策略及竞争分析[J].系统管理学报,19(5):571-576, 2010.
[9]武小平,徐寅峰,郑斐峰,不完全信息下城市交通量分配研究[J].运筹与管理,19(4):116-120, 2010.
[8]武小平,徐寅峰,郑斐峰,路段权重不确定时占线选择路径[J].系统工程, 27(5):117-120, 2009.
[7]郑斐峰,徐寅峰,张娥,占线订单排序C-收益函数下改进的随机策略[J].运筹与管理, 18(6):75-79, 2009.
[6]徐寅峰,张兴国,董玉成,郑斐峰,带预期的占线周期性折扣租赁策略[J],系统工程理论与实践,11: 69-73, 2008.
[5]郑斐峰,徐寅峰,贪婪策略在占线订单加工问题中的竞争分析[J].系统管理学报, 16(4):417-421, 2007.
[4]郑斐峰,徐寅峰,张娥,具有交货期限的占线订单加工[J].系统工程,24(5):101-104, 2006.
[3]徐寅峰,郑斐峰,关于占线广播调度问题的一个下界[J].西安交通大学学报(自然科学版),39(12):1291-1294, 2005.
[2]张娥,郑斐峰,汪应洛,网络广告竞价中的在线拍卖及其竞争策略研究[J].系统工程, 23(6):115-118, 2005.
[1]郑斐峰,徐寅峰,有限预知信息的集装箱搬卸占线问题[J].系统工程理论方法应用, 13(5):390-394, 2004.