Automatic selection of the best performing control point approach for project control with resource constraints
European Journal of Operational Research ( IF 6.0 ) Pub Date : 2024-11-04 , DOI: 10.1016/j.ejor.2024.10.025 Jie Song, Jinbo Song, Mario Vanhoucke
European Journal of Operational Research ( IF 6.0 ) Pub Date : 2024-11-04 , DOI: 10.1016/j.ejor.2024.10.025 Jie Song, Jinbo Song, Mario Vanhoucke
During project execution, the actual project progress shows deviations from the baseline schedule due to uncertainty. To complete the project timely, project monitoring is performed at discrete control points to identify project opportunities/problems and take possible corrective actions. These control points affect the quality of project monitoring and corrective actions, but little guidance is available on identifying situations where the control points pay off the most in terms of project duration.
中文翻译:
为具有资源限制的项目控制自动选择性能最佳的控制点方法
在项目执行期间,由于不确定性,实际项目进度显示与基线进度的偏差。为了及时完成项目,在离散控制点执行项目监控,以识别项目机会/问题并采取可能的纠正措施。这些控制点会影响项目监控和纠正措施的质量,但很少有指导可以确定控制点在项目持续时间方面获得最大回报的情况。
更新日期:2024-11-04
中文翻译:
为具有资源限制的项目控制自动选择性能最佳的控制点方法
在项目执行期间,由于不确定性,实际项目进度显示与基线进度的偏差。为了及时完成项目,在离散控制点执行项目监控,以识别项目机会/问题并采取可能的纠正措施。这些控制点会影响项目监控和纠正措施的质量,但很少有指导可以确定控制点在项目持续时间方面获得最大回报的情况。