当前位置: X-MOL 学术Comput. Aided Civ. Infrastruct. Eng. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Diagnosis of high‐speed railway ballastless track arching based on unsupervised learning framework
Computer-Aided Civil and Infrastructure Engineering ( IF 8.5 ) Pub Date : 2024-09-19 , DOI: 10.1111/mice.13342
Xueyang Tang, Yi Wang, Xiaopei Cai, Fei Yang, Yue Hou

Vehicle‐mounted detection methods have been widely applied in the maintenance of high‐speed railways (HSRs), providing feasibility for diagnosing ballastless track arching. However, applying detection data faces several key limitations: (1) The threshold mostly requires manual setting, making recognition accuracy highly subjective; (2) the extensive workload of manual inspections makes it challenging to label detection data, hindering the application of supervised learning approaches. To address these problems, this paper utilizes the longitudinal level irregularity data obtained from vehicle‐mounted detection, employing the concept of unsupervised learning for dimensionality reduction, combined with clustering algorithms and minimal label fine‐tuning, to design two frameworks: the fully unsupervised framework (FUF) and the few‐shot fine‐tuned framework (FFF). Experiments on dynamic detection data from a Chinese HSR line were conducted, comparing the performance of data dimensionality reduction, clustering, and classification under different strategy combinations. The results show that the improved variational autoencoder significantly enhances the performance of the encoder in dimensionality reduction, facilitating better feature extraction; the FUF achieves effective clustering outcomes without any labeled samples and its adjusted rand index score exceeded 0.8, showcasing its robustness and applicability in scenarios with no prior annotations; the FFF requires only a small number of labeled samples (labeling ratio of 5%) and achieves excellent performance, with metrics such as accuracy exceeding 0.85, thus greatly reducing the reliance on labeled data. This study offers a novel method for solving engineering issues with limited labeled data, providing an efficient solution for identifying track arching defects and advancing railway infrastructure monitoring.
更新日期:2024-09-19
down
wechat
bug