当前位置:
X-MOL 学术
›
J. Earthq. Eng.
›
论文详情
Our official English website, www.x-mol.net, welcomes your
feedback! (Note: you will need to create a separate account there.)
Experimental Study on a Damage-Control and Repairable Fully Precast Beam-Column Joint
Journal of Earthquake Engineering ( IF 2.5 ) Pub Date : 2024-08-19 , DOI: 10.1080/13632469.2024.2389182 Yanxia Ye 1 , Zongbin Wang 1, 2 , Qi Kang 1 , Simin Ma 1 , Hua Huang 3 , Yoshihiro Ito 2
Journal of Earthquake Engineering ( IF 2.5 ) Pub Date : 2024-08-19 , DOI: 10.1080/13632469.2024.2389182 Yanxia Ye 1 , Zongbin Wang 1, 2 , Qi Kang 1 , Simin Ma 1 , Hua Huang 3 , Yoshihiro Ito 2
Affiliation
A novel joint with a splice lap was proposed, which was damage-control and repairable fully precast beam-column joint (DRBJ) connected by energy-dissipating connecting steel plates to remarkably di...
中文翻译:
损伤控制可修复全预制梁柱节点试验研究
提出了一种新型搭接搭接接头,该接头是一种损伤控制、可修复的全预制梁柱接头(DRBJ),通过耗能连接钢板连接,显着降低了连接强度。
更新日期:2024-08-19
中文翻译:
损伤控制可修复全预制梁柱节点试验研究
提出了一种新型搭接搭接接头,该接头是一种损伤控制、可修复的全预制梁柱接头(DRBJ),通过耗能连接钢板连接,显着降低了连接强度。