当前位置: X-MOL 学术Eng. Geol. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Probabilistic evaluation method for the stability of large underground cavern considering the uncertainty of rock mass mechanical parameters: A case study of Baihetan underground powerhouse project
Engineering Geology ( IF 6.9 ) Pub Date : 2024-08-02 , DOI: 10.1016/j.enggeo.2024.107660
Guofeng Liu , Chi Zhou , Kun Feng , Quan Jiang , Shengfeng Li , Han Bao , Ang Li

For deep large underground cavern projects under complex geological conditions, the determination of rock mass mechanical parameters and stability analysis is fraught with a great deal of uncertainty. This paper proposes a set of methods for estimating rock mass mechanical parameters and probabilistic stability assessment suitable for construction characteristics of large underground caverns. On the one hand, according to the Hoek-Brown criterion and Monte Carlo simulation, a dynamic estimation method for rock mass mechanical parameters is proposed by using Rock Mass Rating (RMR), the uniaxial compressive strength (UCS) of intact rock, and the material constant () as input parameters. On the other hand, considering the uncertainty of rock mass mechanical parameters, a probabilistic evaluation method applicable to the unloading response characteristics of rock mass (including displacement and fracturing zones) around the large cavern is put forward, combining the point estimation method and numerical simulation. The proposed methods were applied to an underground powerhouse, with an excavation span of 34 m and height of 88.7 m, at the Baihetan hydropower station in the southwest of China. Based on extensive field investigations and tests, the probability distributions of key rock mass mechanical parameters were obtained. Furthermore, the high sensitivity of input parameters in the H-B criterion for estimating rock mass mechanical parameters were revealed. Through dynamic simulation, the probability distributions of the displacement and fracturing zones in surrounding rock during the layer-by-layer excavation of the cavern were presented. Comprehensive on-site tests showed that the simulated results were in basic agreement with the actual unloading response behavior during the cavern excavation, validating the correctness and applicability of the proposed methods. The study provides a relatively comprehensive approach for estimating rock mass mechanical parameters and stability evaluation in similar underground engineering projects, and also has guiding significance for predicting and preventing engineering rock mass hazards.
更新日期:2024-08-02
down
wechat
bug