当前位置: X-MOL 学术Struct. Equ. Model. › 论文详情
Our official English website, www.x-mol.net, welcomes your feedback! (Note: you will need to create a separate account there.)
Finding the Optimal Number of Persons (N) and Time Points (T) for Maximal Power in Dynamic Longitudinal Models Given a Fixed Budget
Structural Equation Modeling: A Multidisciplinary Journal ( IF 2.5 ) Pub Date : 2023-08-22 , DOI: 10.1080/10705511.2023.2230520
Martin Hecht 1 , Julia-Kim Walther 2 , Manuel Arnold 3 , Steffen Zitzmann 2
Affiliation  

Planning longitudinal studies can be challenging as various design decisions need to be made. Often, researchers are in search for the optimal design that maximizes statistical power to test certai...

中文翻译:

在给定固定预算的动态纵向模型中寻找最大功率的最佳人数 (N) 和时间点 (T)

由于需要做出各种设计决策,规划纵向研究可能具有挑战性。通常,研究人员正在寻找最大化统计功效的最佳设计来测试某些...
更新日期:2023-08-22
down
wechat
bug